Skip to main content
Zemerc
Industrial software, engineering and technical services

Specialist software, engineering and technical services for industrial operations.

Zemerc’s portfolio comprises 27 specialist applications for capital projects, offshore execution, asset integrity, production, safety and corporate governance, each designed to operate independently. Clients may deploy an application on its own, implement and configure it with Zemerc, or engage Zemerc for related engineering and technical services.

27Specialist applications
8Operating areas
Independently operableEngineering & technical services
Engineering and operations teams working across industrial facilities

A portfolio of purpose-built applications, each independently operable and designed around the people, records and controls that govern its area of operation.

Independently operableAdopted one application at a timeApplication interfaces
Flagship applications

Nine applications that demonstrate the breadth of the portfolio.

Process safety, enterprise risk, technical safety, asset integrity, completions, engineering information, management systems, sustainability reporting and operational knowledge are distinct disciplines, each supported by a dedicated system of record. Select an application to explore its scope.

Engineering team reviewing technical drawings and process information
Safety, Risk & AssuranceSee PSM in detail

Process safety treated as an engineering discipline: process hazard analysis and facilitated studies; barrier management and safety-critical elements; safety instrumented functions and requirements; operating envelopes; management of change and simultaneous operations; proof testing; and the process safety event and loss-of-containment records these controls are intended to prevent.

PSM dashboard showing Tier 1 and Tier 2 events, barrier impairments, open recommendations, methodology status, and recorded positions for safety-critical elements, operating envelopes, critical alarms, performance standards, loss of containment and management of change

Scroll horizontally to view the full screen.

0
Functional pillars
0
Controlled documents
0
Business areas
0
Roles
  • UnderstandProcess hazard analysis across HAZOP, HAZID, environmental identification, what-if and structured what-if studies, with workshop recommendations converted into governed actions.
  • ProtectManage barriers and safety-critical elements, safety instrumented functions, safety requirements and alarm management as defined layers of protection against escalation.
  • AssureGovern process safety audits, proof testing, functional safety lifecycle activities and assurance evidence through to the executive assurance position.
  • OperateControl operating envelopes and critical parameters, record deviations, manage change and temporary instructions, govern simultaneous operations and shift handover, and support operational readiness, start-up and shutdown.
  • EngineerGovern engineering calculations, approved methods, method definitions, recorded executions and traceable results.
  • Events and governanceMaintain process-safety event and loss-of-containment records alongside regulatory frameworks, engineering decisions, assumptions, competency records and recommendation tracking.

PSM · RMS · AIRMS · CCMS · TSM · SPIR · LLMS · IMS · ESG. Nine of Zemerc’s 27 specialist applications.

All 27 applications
One authoritative record
Office and field
Connected operations

One governed record. 8 operating areas.

Each Zemerc application owns and governs its own records and remains independently operable. Where records genuinely relate, controlled interfaces connect them. For example, a project gate can reference a punch list, a marine operation can reference a weather hold, and barrier assurance can reference inspection evidence.

Project Delivery & Controls
Deliver · 3 applications

Govern capital-project cost, schedule, interfaces and delivery performance.

PDMSBCMSIFMS
Explore projects
0
applications
0
operating areas
What the governed record shows

Readiness and exposure derived from governed records

Facilities in the programme0 / 12
Across 99 areas on a single baseline
Open Category A punch items0 / 99
Counted against the system that owns the record, without being obscured by portfolio aggregation
Average progress0 / 100
Derived for reporting purposes only; it does not determine gate release
What Zemerc applications support

Govern industrial operations from source record to decision.

Five portfolio capabilities for teams managing projects, assets and safety, each supported by the governed application records behind it.

Governed records

Every application maintains an authoritative governed record.

Documents, revisions, transmittals and registers are controlled at source, giving office and field teams a consistent authoritative record.

  • Controlled documents with revision and transmittal history
  • Registers calculated from source records rather than manually entered totals
  • Lessons and knowledge retained in the context of the work that generated them
EDMS document lifecyclestage 5 of 7
  1. Registered
  2. Numbered
  3. Revised
  4. Reviewed
  5. Approved
  6. Published
  7. Distributed
Controlled document
EDMS: revision history retained
Approved revision in force
Lesson captured and retained
LLMS: controlled knowledge record
Linked to the originating work
Integrated management system
IMS: understand, build, operate
Clause coverage traceable

These capabilities are organised by the operating area that owns the work, the applications that govern the records, and the implementation and technical services that support them.

Solutions by operating area
Services and engagement

Three ways to engage with Zemerc.

Each application is independently operable. Implementation, configuration and technical services are available when required, without forming a condition of the software licence.

Client operated

Operate the application independently

Every Zemerc application is commercially standalone and independently operable. A client may adopt a single application, operate it using its own records and engage Zemerc solely for the software where that model is preferred.

  • No mandatory services obligation attached to the software licence
  • No dependency on any other Zemerc application
  • Adopt one application at a time
Delivered with your team

Implementation with your team

Implementation, configuration, data migration and deployment are carried out with the teams that own, maintain and approve the records. Client rules are translated into enforceable controls while decision authority remains with the client.

  • Six implementation phases with defined responsibilities
  • Client hierarchy, approval routes and validity rules
  • Historical data migrated with provenance preserved
Delivered by Zemerc

Engineering and technical services supporting the application

Where requirements extend beyond software, Zemerc provides engineering and technical services associated with the application. Each engagement is scoped against the required technical outcome, evidence and acceptance criteria.

  • Scoped to a defined record, project, asset or vessel
  • Technical services delivered by specialists who understand the application and discipline
  • Scope and responsibilities defined in the agreement for each application

Professional services

Four service areas aligned with capabilities demonstrably supported by the applications.

  • ImplementationRun the six-phase implementation sequence with the team that owns the record.
  • ConfigurationTranslate client rules into controls enforced by the application
  • Data migrationMigrate historical records while preserving provenance.
  • DeploymentEstablish the approved operating environment for the application
Built around the teams and records that govern the work

Engineered for operational use.

Each Zemerc application begins with the operational record its users already manage, such as a barrier, gate, lift, meter or controlled document. The application is designed around that record and its governing controls, with workflows and evidence models tested before wider release.

  • 27
    applications in the portfolio
  • 8
    operating areas covered
  • 1
    authoritative record for each governed process, shared across office and field teams
How implementation works
Industries

Built for the industrial environments where operational records are created.

The applications are shaped around workflows used in offshore campaigns, process plants, capital projects, producing assets and their supporting supply chains.

One portfolio. Eight operating areas

27 independently operable applications, organised around the operating areas they govern.

Deliver

Project Delivery & Controls

Govern capital-project cost, schedule, interfaces and delivery performance.

View all Project Delivery & Controls applications
Delivery team reviewing a project gate against engineering drawings
PDMS: Project Delivery Management SystemDelivery team reviewing a stage-gate decision against controlled drawings.

See the applications working with your own records

A working session built around one of your own registers, projects or assets, showing the application against representative records and controls.